Frame 7EA 1st Stage Bucket0 pages
Frame 7EA 1st Stage Bucket
Improved Design – Extending the Service Life of Your Parts
PW Power Systems (PWPS) offers 1st stage
turbine buckets for use in Frame 7B / 7EA
gas turbines. The designed buckets offer
enhanced durability and extended part life
at a competitive price.
PWPS is extremely confident in the superior
attributes of our parts that the parts are offered
with an unparalleled guarantee for the life-cycle
of the part.
The PWPS™ Frame 7EA bucket is made of a nickel-base
proprietary superalloy that greatly enhances the life of the part.
Parts are coated with a proprietary coating that provides superior
oxidation resistance and enhanced temperature capability
through improvements in normal mechanical fatigue life.
High-temperature performance up to 2055˚F is achieved with the
application of world-class metallic-bond coating and thermal
barrier coating (TBC).